by Matt Hayes
Trail workdays are a great way to meet people, give back to the community and learn more about the hows, whys, and whos of trailbuilding. While I'm not a master trailbuilder I have learned quite a bit of things over the years donating countless hours of volunteer time to keep St. Louis' trail systems in good shape through maintenance, reroutes and expansion.
This is not meant to be a comprehensive post about trailbuilding nor will it answer all the questions you may have. I think it is easier to address trailbuilding issues as a FAQ - frequently asked questions topic and to use pictures as often as possible. I do not claim to be a great teacher, in fact I'm quite self-conscious about speaking in public and think I do better by showing instead of telling. When I have to lead a crew I find it personally challenging and quite an effort to stay focused. I want everyone to have a good time and I want everyone to want to learn and not feel "bossed around" or disregarded. All volunteers get my complete respect and attention.
With the pictures available to me from the latest trail day at Greensfelder I will help explain what's going on in each photo. If you find anything incorrect or misleading or wish to elaborate on a subject please post it as a comment at the end of this article. The blog is not a one-way street and should be considered a forum for discussion.
Flowy Singletrack
When singletrack is flagged GORC doesn't just meet up in the woods and begin laying down pin flags. In most cases before the first pulaski ever hits the dirt, several months, if not over a year, have passed. In that time GORC trail stewards will meet with land managers, scout trail features, design initial trail lines, adjust the potential lines, perform a GORC peer review, and finally get final design approval from the land managers.
Let's talk about what we see in the photo. First, look at the tape around the tree trunks. Note the direction they are tied. The tied knot always faces the trail corridor. So, if you look down the tree line where trunks were marked every 30 feet or so you can see that the knots are facing the trail bed. This allows the trail designers to see how the singletrack will thread between the trees. When you are walking through a forest it can be hard to visualize where the designed trail is supposed to go if the initial flagging knots are not synchronized.
Next, check out the two trail tape colors. It doesn't matter which color is used - we typically use the standard orange tape. When alternate lines are found or during a peer review some designers see a different way of doing things we will mark the alternate lines with a different color tape. Again, this is so we don't confuse ourselves and this helps us visualize our options quickly. The tape is affixed at shoulder to head height were possible to facilitate line-of-sight and clinometer use.
After a GORC peer review with other trail stewards that are not directly associated with the design is complete and a final line is selected, we will get the land manager's approval. Once the design is signed off we prepare for the workday by laying out pin flags on the forest floor. The pin flags are placed on the downward side of the trail. They are spaced 5 - 15 feet apart so all the volunteers can see where the trail bed should go. Tight, intricate and complex trail segments may feature pin flags only a foot apart to show volunteers exactly where the singletrack must go. Leaves are raked to the low side of the trail so the dirt is exposed and the work begins. The trail bed is cut in to the hill slope with the final tread left 3% - 5% off-camber to facilitate water drainage and prevent pooling. The tread backslope is beveled at a 45 degree or less angle to keep water flow from eroding the backside of the slope. You can see in the picture how the high side slope is angled or feathered.
The dirt that is removed in the making of the bench cut is scraped off the trail on the down side or slope. The dirt must be pulled far enough away so that trail users do not think the "fluff" dirt is part of the solid tread. If the fluff is used as a trail bed it will quickly rut, and worse, erode. It is very important that only the bench cut is used as the tread. This is also why we must make the bench cut wide enough for multi-use traffic, especially at places that have a high equestrian use such as Greensfelder.
Lastly, you can see the new trail is not just a straight cut through the trees. It is designed with flow in mind - this keeps all trail users engaged with the trail and entertained. The trail appears more natural this way. The singletrack is designed around the mature live trees. Only saplings and deadfall are cut and then only sparingly. Large, old growth trees are used as trail anchors and keep the singletrack line from drifting or migrating when horses or bikers may want to use an easier path. If you ever visit a trail system that has few trees you can see how the trails can be very wide from trail drift. A trail system like SIUE prevents singletrack from growing wide due to the thick undergrowth. Next time you ride, check it out.
Critical Line Selection: Something's Got to Give (Sorry, Stump)
Flush cut stumps or large dead ones must be removed with lots of hard work. You may think singletrack can just go through the forest willy-nilly but when you factor in fall-line issues, grade percentages, line of sight and the flow of a given radius curve you can understand why a simple stump can get in the way of our trail bed.
This particular stump was almost in the middle of a critical spot on the trail. If we went above it the trail was too steep dropping into some drainages. Designed below it and the trail had a crazy-sharp turn, a steep step-up and poor line of sight (on a bad turn, no less). So the trail had to go through it. We chopped and chopped and chopped and finally got it out. This was a circumstance where the extra work was completely worth it. The trail absolutely flows around the bend and sets you up for the drainages. With great line of sight to boot!
Trail Tailings and How to Prevent Trail Drift
This photo depicts the need to remove excess dirt from the trail side. This trail piece curves around a drainage bowl and all too often I see our trails drift. Equestrians and bikers, by their nature, want to use the easiest path available to them. This would mean cutting the contoured trail curve and walking in a straight-shot over the fluff. Eventually, this creates a maintenance issue as the used line would pot-hole and erode to an off-camber mess. Not too mention the tread would grow 10-15 feet wide and never look quite the same again.
The extra dirt is removed further down the drainage to "show" trail users the intended trail line. With the excess dirt gone, the downslope contour is visibly unsustainable, undesirable and not worth the effort to shortcut. This is an important step in the trailbuilding process that cannot be emphasized enough. The trail is not finished until the fluff dirt is removed away from the benchcut.
The Weed Wrench vs. Sapling
You may notice larger tree saplings that are cut waist-high or higher. GORC used a tool called a weed wrench that can pull these stobs out of the ground, roots and all. The tool needs a bit of trunk length to use as leverage when pulling the roots out of the ground. Simply cutting saplings flush to the ground presents maintenance and other issues.
As a trail beds in over time and the dirt settles the stump will seem to grow higher and higher out of the ground. The roots will become exposed and eventually rot. This can lead to trail erosion and is an eyesore to all user groups. A cut tree stump is an unnatural feature that is man-made - a negative feature that is better removed during the original trail construction process.
Hopefully after reading this you have had some of your questions answered and hope to see you out at a trail workday in the near future. GORC is always seeking out new volunteers and members. If you have additional questions or wish to share your thoughts be sure to comment on this post.
Some other useful information:
What to Expect at a Workday
Maintenance Concerns
Reporting Your Volunteer Hours
No comments:
Post a Comment